Mon–Sat, 9:30 AM – 7:00 PM Bapunagar, Ahmedabad

Tender-ready supply

Cement Supply for Government & Infrastructure Projects

Cement for contractors on PWD, NHAI, irrigation, urban-development and PSU-led projects across Gujarat — with the documentation government audits demand.

Tender-readyDocumentation
BIS-markedEvery consignment
GST 18%Invoicing & e-way bill
MTCBatch test certificate

Documentation that clears government audits

Government and PSU projects hold cement supply to a higher standard than private work. The cement itself is the same BIS-marked OPC, PPC or PSC — but the paperwork, audit trail and tender compliance are far more demanding. Every consignment we deliver to a government contractor is accompanied by:

  • GST tax invoice with HSN 2523 and the correct CGST + SGST or IGST breakup
  • E-way bill with vehicle and route details
  • Weighbridge slip from the manufacturer's plant
  • Transporter lorry receipt (LR)
  • Manufacturer batch test certificate (MTC) with strength and chemistry results
  • BIS marking traceability — lot numbers cross-referenced to the licence
  • Manufacturer dispatch advice and challan
  • Site receiving acknowledgement, signed and returned

Missing a single document can hold up a running-account bill. Read our detailed guide: cement for government projects — BIS, GST & documentation.

Tender and empanelment support

For contractors bidding on government tenders we provide pre-bid quotations, manufacturer dispatch commitment letters where applicable, and price-validity statements as required by the tender document.

Once your tender is awarded we move to locked-rate supply for the project duration, coordinating directly with your quality-control engineer, stores in-charge and accounts team.

Project types we supply

Highways & roads

National highway, expressway and state PWD road packages — PQC, structures and culverts.

Bridges & flyovers

State PWD and NHAI bridge works, ROBs and elevated corridors. Bridge supply →

Irrigation & water

Canal networks, water-supply grids and treatment plants — often PSC. PSC →

Urban development

Municipal and urban-development authority works — drainage, roads and public buildings.

Metro & rail

Metro viaducts, stations, depots and rail infrastructure. Metro supply →

Public buildings & PSU industrial

Schools, hospitals, offices, refineries, power plants and port expansions.

GST on cement for government contractors

Since 22 September 2025, cement (HSN 2523) attracts 18% GST — CGST 9% + SGST 9% for supply within Gujarat, or IGST 18% for inter-state supply. Registered contractors can claim input tax credit where eligible, provided the invoice carries both GSTINs, the HSN code and a valid e-way bill.

Quality control we support

  • Single-brand, single-plant supply for a work package when the specification requires it
  • Coordination for third-party inspection or sampling at the dispatch point
  • Manufacturing-date checks so cement reaches site well within its shelf life
  • Supply from brands on your tender's approved-manufacturer list
Bidding on a PWD, NHAI or PSU tender?

Get pre-bid rates and supply letters within the day.

Request tender quote

FAQ

Frequently asked questions

Are you empanelled with PWD or NHAI?

Cement for these works is normally procured by the contractor, not by the department. We supply contractors and EPC firms who are empanelled with PWD, NHAI, irrigation and PSU departments.

Can you provide letters for our tender bid?

Yes. For live tenders we can provide price-validity letters, manufacturer dispatch commitment letters where applicable, and BIS-marked supply assurance.

Which documents come with each consignment?

Every load carries a GST tax invoice, e-way bill, plant weighbridge slip, manufacturer test certificate (MTC), transporter LR and a delivery challan for your site records. The paperwork is tender- and audit-ready.

Do you supply small government sub-contractors?

Yes — from large EPC firms to sub-contractors handling a single work package. Our minimum order is usually one full truckload — roughly 16–28 MT depending on the vehicle (about 320–560 bags).

How fast is dispatch after I confirm an order?

Standard turnaround is 24–72 hours from order confirmation to plant dispatch, depending on the brand, plant and destination. For time-critical pours we book priority dispatch slots with the manufacturer in advance.

Need cement for your project?

Share the brand, grade, quantity and site location — get a same-day quotation with plant-direct dispatch.